Dad's new hangout is underway. Morton is doing the shell and dad and I are doing the rest, wiring, plumbing, interior walls, etc. Morton is supposed to be done this week but we will see, the rain is messing things up a bit. We already had the grade ready and rock in, they started on it Monday, the pics below I took Tuesday eve, yesterday we were rained out, not sure what will be today yet.
They are doing the basic building because of the warranty and the fact that they put up a lot of big buildings for us a little over 40 years ago and we have had absolutely no problems out of any of them. They make all the materials themselves and handle all warranty claims in house so there are no hoops to jump through. 50 years on posts and snow load with no weight limit, 35-Year Paint Warranty even if it fades or chalks, lifetime on windows and doors, five-year wind warranty with no velocity limit (including a direct hit from a tornado), and includes all materials and LABOR for the full-life of the warranty with no pro rating.